Paper Bridge Engineering
Engineer a paper bridge that supports the greatest load using limited materials.
Paper, tape, two books, coins
What to do
Place two books a fixed distance apart.
Build a bridge using one sheet of paper.
Add coins one at a time until the bridge fails.
Change the paper geometry without adding material.
Retest and compare the improvement.
What this develops
Structures, compression, geometry, testing and optimisation.
Use age-appropriate supervision and safe materials. Stop any activity that is unsuitable for the learner or environment. These resources are educational activities, not professional laboratory, medical or safety instructions.
Want a complete science pathway?
Move from a free activity into courses, camps, homeschool curriculum or a bespoke school programme.